Chinese New Year 2027 lands on 6 February. For anyone buying custom plastic packaging from Asia, that date is not a holiday to note on a calendar — it is a hard stop that quietly moves backwards through your entire supply chain. Factories wind down in late January, freight cutoffs for pre-holiday arrival land in early-to-mid January, and any tooling that has not been released by late November will not be sampling before the shutdown. The buyers who get caught out are rarely the ones who forgot the holiday. They are the ones who assumed a three-week production time still applied in January.
This guide is written in late November — the last window in which a first-time order can still be planned around the 2027 holiday rather than around the recovery. It gives the real dates, the lead times by order type, the categories most likely to collide, and a five-item checklist for what to lock down now. If you take a custom pack to market, this is the piece to read before the year-end rush sets the schedule for you.

Start from the holiday and count backwards. The public holiday runs 6–12 February, but production does not stop on the 6th. Chinese factories typically run a reduced schedule through late January and close fully in the days before the holiday, then resume on a staggered basis through mid-to-late February. Ocean freight adds its own layer: to have stock on a shelf before the holiday disruption, containers need to be cut off in early-to-mid January. Work those three layers together and the planning window collapses fast.
| Milestone | Approximate window | What it means for your order |
|---|---|---|
| Freight cutoff for pre-holiday arrival | Early–mid January 2027 | Final cartons must be packed and handed to the forwarder by this point |
| Factory shutdown | Late January 2027 | Production, sampling and tooling changes stop; no new approvals |
| Public holiday | 6–12 February 2027 | No business activity; confirm your supplier’s exact return date |
| Staggered restart | Mid–late February 2027 | Capacity ramps gradually; first slots go to long-standing customers |
The practical takeaway: the last safe moment to release new tooling is late November, not “after the Christmas rush”. Every week of slippage in December removes a week of sampling and a week of buffer from the front of your schedule.
Buyers talk about “lead time” as if it were one number. It is not. Three order types run on three different clocks, and only two of them are still comfortably inside the pre-holiday window in late November.
| Order type | Typical lead time | Realistic for pre-CNY 2027? |
|---|---|---|
| Stock item / existing mould, no print | 2–3 weeks | Yes, if released before mid-December |
| Existing mould with custom print or label | 3–4 weeks including artwork approval | Tight but workable; artwork must be final now |
| New tool, custom size or structure | 6–8 weeks including sampling | Only if tooling is released by late November |

The middle row is where most holiday surprises happen. A standard thermoformed tray can ship quickly, but a custom print on that tray still needs plates, proofs and an approval cycle. Artwork revision time is not absorbed by the factory — it comes out of your buffer.
Not every order is equally exposed to the shutdown. Three categories consistently run out of road first, and all three are driven by decisions made well before production starts.
Custom colours. Matching a brand colour means a material run, a sample and an approval. A colour that is “close enough” in December becomes a rejected sample in January, with no time to re-run before the closure.
New tooling. Tool design, cutting and trial runs sit ahead of the production clock. A new size has the longest path to market and the least tolerance for a late change.
Large-volume programs. Even with an existing mould, a big order needs more production days and more packaging labour. It must be scheduled ahead of smaller runs, or it lands after the restart.
If your pack falls into any of these three, the question is no longer “can we make it in time” but “which approval can we compress without compromising the result”. That is a conversation to have with the supplier now, not in the first week of January.
The following checklist is deliberately short. Each item removes a specific source of delay from the pre-holiday schedule, and each one is still achievable at the time of writing.

A year-end deadline punishes the slowest step in your packaging route. For shallow, high-volume trays, thermoforming usually reaches a sample faster than injection moulding because the tool is simpler to produce and revise. That difference is small in a normal month and decisive when only six weeks remain. The advantages of thermoforming trays in a lead-time crisis are not just cost — they are the speed at which a design can be corrected and re-sampled.
This does not mean thermoforming is always the answer. Deep draws, tight tolerances and very high volumes can justify an injection tool. But if the decision is still open in late November, the tooling clock should carry real weight in the choice.
A supplier who answers these five questions with dates rather than assurances is telling you how their schedule really works. That is information worth having before you commit to a launch date.
When is Chinese New Year 2027? The holiday begins on 6 February 2027, with the public holiday running through 12 February. Factory shutdowns start earlier, typically in late January.
What is the last safe date to order custom trays? New tooling should be released by late November to allow design, tooling and sampling before the January closure. Stock and existing-mould orders still work into December, provided artwork is final.
Can production continue during the holiday? Most factories stop completely. A few keep a skeleton team, but capacity and freight availability are both limited, so it should never be part of the plan.
Will ordering in January be cheaper? Sometimes, but any saving is usually lost to delayed sampling, air freight or a missed selling season. The real cost of a late order is the window you cannot sell into.
What if my design is not final yet? Lock the dimensions and the order structure now, and hold only the decorative artwork. That keeps tooling on schedule while leaving room for a design decision in December.